HERA Beam Dynamics Meeting / Minutes : 05.08.2004

Attending :
D.Barber, M.Bieler, M.Hoffmann, B.Holzer, J.Keil, E.Kot, M.Minty, E.Negodin, U.Schneekloth, M.Vogt, F.Willeke.

Topics :

  1. Schedule for next machine studies

    Shift/Day THU, 12.08. FRI, 13.08. SAT, 14.08. SUN, 15.08.
    Morning 1:
    Alternative e-Tunes for Lumi
    WiO=M.M. / Kümm=M.M.
    3:
    p-Lonitudinal Multibunch
    Instabilities (ramp)
    WiO=R.W. / Kümm=M.H.&E.K.
    5:
    Test p-Operation with Fields
    in e- Configuration
    WiO=R.W. / Kümm=B.H.
    3:
    p-Lonitudinal Multibunch
    Instabilities (ramp)
    WiO=R.W. / Kümm=M.H.&E.K.
    Afternoon 2:
    Coherent BeamBeam Excitation
    (vs. p-phase-advances W/O)
    WiO=M.B. / Kümm=M.V.
    4:
    e-arc-BBA tests
    WiO=M.M. / Kümm=J.K.
    5:
    Test p-Operation with Fields
    in e- Configuration
    WiO=M.M. / Kümm=B.H.
    3:
    p-Lonitudinal Multibunch
    Instabilities (ramp)
    WiO=M.M. / Kümm=M.H.&E.K.
    Night 3:
    p-Lonitudinal Multibunch
    Instabilities (ramp)
    WiO=E.K. / Kümm=M.H.&E.K.
    3:
    p-Lonitudinal Multibunch
    Instabilities (ramp)
    WiO=M.B. / Kümm=M.H.&E.K.
    5:
    Test p-Operation with Fields
    in e- Configuration
    WiO=M.B. / Kümm=B.H.
    RESEVE
    WiO=J.K.
  2. ad 1: Alternative e-Tunes for Lumi
  3. ad 2: Coherent BeamBeam Excitation (vs. p-phase-advances W/O)
  4. ad 3: content removed in response to authors demand (vogtm: 04.11.2009)
  5. ad 4: e-arc-BBA tests
  6. ad 5: Test p-Operation with Fields in e- Configuration