HERA Beam Dynamics Meeting / Minutes : 15.04.2004

Attending :
F.Brinker, E.Kot, E.Negodin, U.Schneekloth, M.Vogt, F.Willeke.

Topics :

  1. Program for HERA improvements (see meeting 17.07.03) :
  2. HERA : today 08:30 : TSP @ absorber SR11 : vacuum leak ⇒ IR-S vented
  3. Plans for machine studies after next maintanance day (06.05.04)
  4. Polarization of ca. 50% achieved with flipped rotator polarities
  5. e- operation
    Not yet clear whether to switch before or directly after this year's summer-shut-down, or even later. → discussion with experiments.
    Three potential major causes of trouble :
    1. flipping the polarity of all power supplies
    2. different orbit @ IP's ← shifted IR-quads !
    3. ``the aftermath of the summer-shut-down''
    ⇒ suggested scenario (if an early switching seems preferrable) :
  6. In 2 weeks : dedicated BD-meeting on + INJECTION
  7. EPAC 04 : (see minutes / 29.01.04)

Return to: HERA BeamDynamicsMeeting homepage, HERA homepage, DESY homepage , MPY homepage , Machine Status .