HERA Beam Dynamics Meeting / Minutes : 09.10.2003

Attending :
D.Barber, M.Bieler, W.Decking, S.Herb, M.Hoffmann, J.Keil, M.Minty, D.Pitzl, M.Vogt, R.Wanzenberg, F.Willeke.

Topics :

  1. Venting of flange SR11 : orbit controll
  2. Hot spot OR34 :
  3. QC's OR12/OR14 :
    The QC's have been lowered. Improvement not yet veryfied with beam. ⇒ later today
  4. Vakuum leak at Cavities OR 75/76 :
  5. Short to ground at BU NL :
  6. NMR / Zanon reference magnet :
    During thies weeks p-Injektion studies, the magnet compensation (NMR inside reference magnets hall W) seemed to be unstable. Experts are working on the problem.
  7. Cable length compensation for HIT to be switched to ``winter'' eitehr this or next week
  8. Agenda for next week's meting :
    orbit analysis / orbit steering / orbit interlock / file assignment procedures / ...