usually on Thursdays at 10:00 in 30b/459
Visit the
homepage for the HERA Machine Studies !
Visit the
DESY Accelerator Physics Seminar Homepage !
THE HERA-II ESSENTIALS
MEETINGS :
GOTO
top,
2006,
2005,
2004,
2003,
earlier meetings,
IMPORTANT MESSAGE,
bottom.
- 26.04.07 MINUTES
- 25.01.07 MINUTES
- 2006 :
( up )
- 31.08.06 MINUTES
- 03.07.06 (Kuemmerer meeting) MINUTES
- 22.06.06 MINUTES
- 15.06.06 MINUTES
- 23.03.06
- MINUTES
- [F.Willeke] :
Low (proton-) Energy Running / revision 2
- 16.03.06
- MINUTES
- [F.Willeke] :
Low (proton-) Energy Running
- 19.01.06
- MINUTES
- [B.Holzer] :
A new proton lumi optics with βx=2.20m and
βy=0.16m
- 12.01.06 MINUTES
(including tentative recommisioning schedule)
- 05.01.06 MINUTES
- 2005 :
( up )
- 22.12.05
- MINUTES
- [B.Nagorny] :
Dipole Synchrotron Radiation at the Belows of the Spin Rotators
- 15.12.05
- MINUTES
- [S.Brinker] :
Der p-TuneController
- 07.07.05
- MINUTES
- [A.Kling] :
Dust Trapping in HERA-e
- 19.05.05
- MINUTES
- [E.Kot] :
The Head-Tail Instability at HERA-p
- 24.03.05 MINUTES
- 03.03.05 MINUTES
- 24.02.05 MINUTES
- 10.03.05 MINUTES
- 02.03.05 MINUTES
- 27.01.05 MINUTES
- 20.01.05 MINUTES
- 13.01.05 MINUTES
- 06.01.05 MINUTES
- 2004 :
( up )
- 16.12.04 MINUTES
- 09.12.04 MINUTES
- 25.11.04 MINUTES
- 18.11.04 MINUTES
- 11.11.04 MINUTES
- 05.11.04 MINUTES
- 04.11.04
- MINUTES
- [C.Muhl (ZEUS)] :
Simulation of mechanical stress & temperature distributions on the
GI R07 chamber
- 28.10.04
- MINUTES
- [M.Bieler]:
Schedule until 09.11.04
- [B.Holzer] :
Magnet files for e--p operation
- 21.10.04 MINUTES
- 14.10.04 MINUTES
- 07.10.04
- MINUTES
- [M.Vogt] Evaluation of the coherent beam--beam studies before
the shutdown file missing
- 30.09.04
- MINUTES
- [E.Gianfelice-Wendt] A new optic for the EL-Weg ?
(ps)
- 15.09.04 : special meeting on shifted e- IPs
- MINUTES
- [J.Keil] : Alternative Elektron Design-Trajektorien für HERA
(pdf)
alternative orbit (data directory) :
t1_env.txt ,
t1_inp.txt ,
t1_opt.txt ,
t1_surv.txt ,
t1_magn.txt ;
- 09.09.04
- [E.Kot] : Studies on longitudinal multibunch instabilities in HERA-p
(file missing)
- 19.08.04
- MINUTES
- [M.Minty] : Beam-Beam Studies with Alternative e-Tunes
(pdf)
- 12.08.04 no meeting
- 05.08.04 MINUTES
- 29.07.04 MINUTES
- 08.07.04 no meeting
- 01.07.04 no meeting
- 24.06.04 no meeting
- 17.06.04 MINUTES
- Meeting on HERA improvements 16.06.04 :
Diagnosis and Instrumentation (pdf)
- 10.06.04 MINUTES
- 03.06.04 MINUTES
- 28.05.04
- MINUTES
- R.Wagner : Recent measurements with PhaseLoop-1
block diagram (pdf),
p-inj : transf.1, transf.2 (pdf),
transf.3, 820GeV (pdf)
- 21.05.04 MINUTES
- Meeting on HERA improvements 18.05.04 :
p-HF (pdf)
- Meeting on HERA improvements 13.05.04 :
Diagnosis and Instrumentation (pdf)
- 13.05.04 no meeting
- 06.05.04 MINUTES
- 29.04.04
- MINUTES
- [M.Hoffmann] : The Low Level RF Generation Device
( transparencies )
- 22.04.04 MINUTES
- 15.04.04 MINUTES
- 08.04.04
- MINUTES
- [M.Vogt] : Recent Observation of Longitudinal MultiBunch Modes in HERA-p
(ps)
- [E.Gianfelice-Wendt] : New Instructions for Polarsation Tuning
(ps)
- 01.04.04 MINUTES
- 25.03.04 MINUTES
- 18.03.04
- MINUTES
- [J.Keil] : the ORM at e-lumi from 07.03.04
(compared to 12.09.2003 and 26.02.2004)
(ps)
- 11.03.04 MINUTES
- 04.03.04 MINUTES
- 26.02.04 MINUTES
- 19.02.04 MINUTES
- 12.02.04 MINUTES
- 05.02.04 no meeting
- 29.01.04 MINUTES
- 26.01.04 / 16:00 / Extra meeting on Experiments on luminosity
- MINUTES
- [F.Willeke] : Evaluation of the lumi runs since January 1-st
file still missing
- [M.Vogt] : Evaluation of the Longitudinal Lumi Scan at H1
(08.01.04-night)
(pdf)
- ZEUS: [U.Schneekloth] Offline analysis of the lumi data &
emittance measurement using the γ-spot in the spectrometer
(pdf)
-
Machine Studies homepage
- 22.01.04
- MINUTES
- [F.Willeke] : Evaluation of the first 25 lumi runs at (H1)
(ps) ,
(mathcad)
- 15.01.04
- MINUTES
- Evaluation of long. lumi scan [M.Vogt] : Figures & Files :
- 08.01.04
- MINUTES
- K.Wittenburg :
(on beam-current limits for the HERA-e wire scanner)
(pdf)
- 2003 :
( up )
- 18.12.03
- MINUTES
- M.Vogt :
preliminary evaluation of
ep-lumi-TuneStep4vs1
- M.Hoffmann :
transparencies to be filled in after New-Year
- 11.12.03 MINUTES
- 04.12.03
- MINUTES
- BHolzer : Estimates on Proton Beam Survival Timw in Case of
Mini-Beta Powersupply Failures
(pdf)
- F.Willeke :
Tracking simulation about p-beam survival times after a mini-beta PS-fast-dump
(pdf)
- 27.11.03
- MINUTES
- R.Wagner :
Block Diagram of single 208 MHz system (pdf)
- W.Decking :
status of e+ dispersion correction facility (pdf)
- 20.11.03 MINUTES
- 13.11.03
- MINUTES
- M.Hoffmann :
The HERA lumi pilot (pdf)
- M.Vogt :
The HERA file system (ps)
- 06.11.03 MINUTES
- 30.10.03 no meeting
- 23.10.03 no meeting
- 16.10.03
- MINUTES
- F.Willeke :
Orbit Effects on Synchrobetatron Resonances
- F. Brinker :
Analyse des Orbits vom 26.12.2003 00:16
- 09.10.03 MINUTES
- 02.10.03 no meeting
- 25.09.03
- MINUTES
- Polarization Optimization
Guide (21.09.03, ps)
- Current
Status (regularly updated)
of Polarization Optimization
- 18.09.03
- MINUTES
- Schedule for next studies :
Machine Studies Homepage
- Preliminary reults of IR-BBA
(pdf)
- ORM/e+ : helum72
x (eps) ,
y (eps)
- Dispersion/e+ : helum72
Disp. (eps) ,
ΔD (eps) ,
ΔD/sqrt(β) (eps)
- 11.09.2003
- MINUTES
- Bake out summary
(pdf)
- Summary on HERA-e MB-FB procedures
(no file yet)
- 04.09.2003 MINUTES
- 29.08.2003 MINUTES
- 21.08.2003 MINUTES
- 14.08.2003
- MINUTES
- new (again) recommissioning schedule
and updated
run schedule
- ORM and dispersion measurement for HERA-e at injection :
ORM/hori. ,
ORM/vert. ,
dispersion ,
ΔD ,
ΔD/sqrt(β)
- ORM and dispersion measurement for HERA-p at injection :
ORM/hori. ,
ORM/vert. ,
dispersion ,
- 07.08.2003 : no meeting
- 31.07.2003
- MINUTES
- new DETAILED recommissioning schedule
- Preliminary evaluation of proton geometric apperture scan (automatically scanned bumps only) :
envelope x ,
norm. env. x ,
envelope y ,
norm. env. y ;
manually scanned bumps to be included later !
- 25.07.2003
- MINUTES
- new recommissioning schedule
- 17.07.2003
- MINUTES
-
old (02.2003) but updated list of (accelerator physics) projetcs
- new (07.2003) list of projetcs :
(.xls) or
(.ps reformatted!)
- 10.07.2003
- J.Keil :
Orbit Response Matrix Analysis for PETRA-e
- EARLIER :
( up )
-
Tentative schedules of earlier meetings (thanks to M.Hoffmann)
Want to learn HTML ?? Want to write the next minutes ??
This is a unique oportunity to improve your html programming skills !
Do not just surf the web - take part in creating it and make it a usefull
source of information !
Take a copy of the minutes template and
volunteer to write next week's minutes !
NOTE : browser generated files cannot be accepted.
(For obvious reasons : information - not presentation is the aim !)
You can learn to use about 5 different html tags, can't you ?
Return to:
( up )
HERA homepage,
DESY homepage ,
MPY homepage ,
Machine Status .